ALPHA The archive is live and growing — the AI ingestion operator is in active development. Share feedback
Loading entry…

Primary Source Records · Source Documents

Recovery.gov

Recovery.gov was the site that tracked every dollar of the 2009 stimulus — where it went, to which contractor, in which county — and it was the template a decade of open-government work was built on. The board that ran it was wound up in 2015 and the domain no longer resolves in DNS. A site built to make spending permanently auditable is itself no longer readable except in an archive, which is either an irony or a warning depending on how charitable you feel. 59 pages are held here, recovered from the Internet Archive.

Period
2009
Region
United States
Language
English
Rights
Public domain. A work of the United States Government is not subject to copyright under 17 U.S.C. § 105, so it is held in full with no exception claimed and none needed. Published by Recovery Accountability and Transparency Board at recovery.gov, where the host no longer resolves in DNS as last checked on 2026-09-22.
Source
https://recovery.gov/

Full text

RECOVERY.GOV Recovery Accountability and Transparency Board

Captured from the Internet Archive on 2026-09-22. recovery.gov no longer resolves in DNS. This file holds 59 pages, the most substantial the Archive has for that host. It is a capture of a site, not a complete mirror of it: pages the Archive never visited are not here, and neither are images, downloads or anything the site generated for a logged-in visitor. Each page is headed with its title, its address and its capture date.

====================================================================== USDA - Financial and Activity Report | Recovery.gov www.recovery.gov/?q=content/weekly-report&agency_code=12&agency=&startdate=2009-08-28&noofreports=2&summarytype=&report_id=1100&nex= — captured 2009-09-07 ======================================================================

- Total Available: $5,324,940,313

- Total Paid Out: $4,027,795,289

- Continuing with the execution of the ARRA Program. To date, 24 contract actions have been processed for a cumulative total of $4,886,100.

- USDA continues to purchase food for the purpose of supporting The Emergency Food Assistance Program (TEFAP) in each State, and the increased TEFAP outlays reflect these purchases. Purchases of food with TEFAP ARRA funds continue. During the week of July 6, 2009, contracts for peanut products were awarded. The Agricultural Marketing Service will attempt another deli turkey buy for delivery in September 2009. The Farm Service Agency was unable to procure all the demand for peanut products because of industry capacity issues. States will be given the opportunity to move these orders into future deliveries or order other products. States are working to place new orders for the balance of their funds. Products available for States to order include: ham sliced 2-lb for October 2009 delivery; cheese (reduced fat) 2 lb loaves and 5 lb sliced for January and February 2009 delivery; and peanuts and peanut butter for October and November 2009 delivery. Invitations for bid will continue to be issued during July 2009. Below is a breakdown of the value of orders purchased and the value of purchases in progress. Total product values are estimated because actual prices will not be known until the purchases are made. Deliveries began the second half of May 2009, and will extend through February 2010. Commodity Amount Purchased Purchase in Progress Total Value Percentage of Total Dollars Type (In millions) (in millions) (in millions) Poultry 17.6 0 17.6 18 Livestock 25.4 7.0 32.4 33 Canned Fruit 15.2 0 15.2 16 Peanut Products 7.4 7.6 15.0 15 Cheese 8.0 9.5 17.5 18 All Products 73.6 24.1 97.7 100

- SNAP benefits are issued to participants in every State on an ongoing basis, and this issuance is reflected in the increased obligations and outlays. Obligations for the Food Distribution Program on Indian Reservations are being made to Indian Tribal Organizations (ITOs) and State agencies. These obligations are for budget amendments to their current agreements to reflect the use of ARRA funds for the purchase of equipment or for facilities upgrades.

- States continue to make awards to school food authorities to purchase food service equipment, and these awards are reflected in the increased outlays for the National School Lunch Program.

- Chief's Letter- FollowingSecretary Vilsack's announcement of additional funding under the American Recovery and Reinvestment Act (ARRA) for 105 Forest Service (FS) projects funded at more than $94.6 million, the Chief issued a letter directing prompt obligation of the funds and implementation of the projects. Approved Projects - In addition to the above, the Forest Service continued implementing the projects previously approved by Secretary Vilsack under ARRA. These projects total $936,641,700 or about 81 percent of the total amount of ARRA money received by the Forest Service for wildland fire management, construction and maintenance of facilities, roads and trails, and abandoned mine mitigation. The Agency has obligated $235,277,792through August 28. Outreach - The FS participated in National Minority Enterprise Development week August 26-28 in Washington, DC to promote employment and contracting opportunities through FS recovery projects. Milestones - The FS Recovery Plan includes a series of measurable goals such as the one cited above. The Forest Service has developed a series of milestones in order to better track progress towards the goals. Goals established for financial performance, capital improvement and maintenance activities and wildland fire management have been divided into quarterly increments, or milestones, so the Agency can assess its progress and make strategic adjustments as needed. Impact of ARRA on Tribes - the Agency has completed a draft analysis on the affect of ARRA projects on tribes. Benefits include job opportunities for local tribes and improving habitat and watersheds that support rural subsistence for traditional uses and food sources. In addition, the wildland fire management funds are providing increased wildfire protection for tribal lands through hazardous fuels reduction projects adjacent to communities. Some of the woody material being removed in such projects is being made available for the local tribal forest products industry. Finally, tribes are benefiting from invasive species control on and around tribal lands. Capital Improvement and Maintenance * The Forest Service continues to implement more than $274 million of funding announced for Capital Improvement and Maintenance - trails and facilities. * The Forest Service continues to implement 106 ARRA roads maintenance and associated watershed and ecosystem restoration projects on Forest Service lands in 31 states totaling $228,480,500. * The Forest Service continues implementation of 14 abandoned mine lands projects on Forest Service lands in seven states totaling $19,884,000. * The Forest Service continues implementation of the first set of projects approved under ARRA for Capital Improvement and Maintenance. * The FS monitors program accomplishments achieved through ARRA funding using measures such as "miles of trail maintained to standard." As a result of ARRA projects over 400 miles of trails have been maintained through August 24. Wildland Fire Management * The Forest Service continues to implement projects supported by $223.6 million of ARRA funds to reduce hazardous fuels, and over $38 million in projects funded by ARRA to manage invasive species. * ARRA wildland fire management allocations to date are $411,130,426of which$160,349,271 has been obligated. through August 28. * The FS monitors program accomplishments achieved through ARRA funding using measures such as "The number of acres treated to reduce the risk of catastrophic wildfire." As a result of ARRA projects, 33,000 acres have been treated to reduce wildfire risk. * The Forest Service continues to support wood-to-energy grants and woody biomass utilization projects totaling $57 million in ARRA funds. * The Forest Service continues implementation of the first set of projects approved under the ARRA for wildland fire management.

- Loan level obligations: Water and Environmental Loans/Grants:$ 1,211,978,271 / Business and Industries Loans/Grants: $7,420,592 / Community Facilities Direct Loans/Grants: $144,729,150/ SFH - Direct: $197,001,457 / SFH - Guaranteed: $7,102,788,769

- Loan level obligation: Water and Environmental Circuit Rider Contract Modifications: $4,100,334

- The Secretary announced the sixth tranche of Community Facilities projects totalling more than $54 million on August 26, 2009.

- The Secretary announced the seventh tranche of Water and Waste Disposal projects totalling $175.8 million on August 25, 2009.

- Posted to the USAJobs Web site, 2 recruitments for temporary positions to support the implementation of the Broadband Program under ARRA. Anticipate filling advertised positions by early September. To date, USDA Rural Development has filled 62 temporary positions nationwide to support the implementation of RD Programs under ARRA.

- Sent additional guidance to headquarters and State office staff on appropriate use of ARRA administrative funding in support of Rural Development program dollars.

- A pre-bid conference for interested bidders was held onAugust 11, 2009. USDA will prepare and issue an amendment to the solicitation to respond to questions from potential bidders to date. The solicitation notice or invitation for bid (IFB) will close on August 28, 2009. A construction contract is expected to be awarded by September 30, 2009. The construction and repair work is expected to be completed in November 2010.

- It is anticipated that approximately $100,000 will be obligated for the next reporting period. For the 4h quarter FY 2009, we anticipate obligating approximately $8,017,000.

- Capital Improvement and Maintenance Continued posting of major ARRA communications; Continued implementation of approved projects. Wildland Fire Management * An announcement about the distribution of $67,108,700 inForest Service ARRA funds for 58 forest health projects is expected next week; * The Forest Service has received a number of inquiries at various units from recipients about reporting. Recipients want more information about their reporting responsibilities. The Agency is keeping its ARRA points of contact in the field informed about reporting information sources so they can assist recipients. It is also directing recipients to Recovery.gov, and the website of the Office of Management and Budget for online training and other information, and has added links from the FS ARRA website to these resources. Continued posting of major ARRA communications; Continued evaluation of ARRA project proposals; Continued implementation of approved projects.

- Expect to announce the seventh tranche of Community Facilities projects; estimated total $17.5 million.

- Expect to announce the eighth tranche of Water and Waste Disposal projects totalling in excess of $172.5 million.

- Submit the first tranche of Business and Industry projects totalling more than $13 million to OMB for clearance.

View Source file Report History Report Date Source 2009-08-28 View Source file 2009-08-21 View Source file 2009-08-14 View Source file 2009-08-07 View Source file 2009-07-31 View Source file 2009-07-24 View Source file 2009-07-17 View Source file 2009-07-10 View Source file 2009-07-03 View Source file 2009-06-26 View Source file 2009-06-19 View Source file 2009-06-12 View Source file 2009-06-05 View Source file 2009-05-29 View Source file 2009-05-22 View Source file 2009-05-15 View Source file 2009-05-08 View Source file 2009-05-01 View Source file 2009-04-24 View Source file 2009-04-17 View Source file 2009-04-10 View Source file 2009-04-03 View Source file 2009-03-27 View Source file 2009-03-20 View Source file 2009-03-13 View Source file 2009-03-06 View Source file 2009-03-02 View Source file

YOU ARE EXITING THE RECOVERY.GOV WEBSITE

====================================================================== USDA - Financial and Activity Report | Recovery.gov www.recovery.gov/?q=content/weekly-report&agency_code=12&agency=&startdate=2009-08-28&noofreports=2&summarytype=&report_id=1100&nex=1 — captured 2009-09-07 ======================================================================

- Total Available: $5,324,940,313

- Total Paid Out: $4,027,795,289

- Continuing with the execution of the ARRA Program. To date, 24 contract actions have been processed for a cumulative total of $4,886,100.

- USDA continues to purchase food for the purpose of supporting The Emergency Food Assistance Program (TEFAP) in each State, and the increased TEFAP outlays reflect these purchases. Purchases of food with TEFAP ARRA funds continue. During the week of July 6, 2009, contracts for peanut products were awarded. The Agricultural Marketing Service will attempt another deli turkey buy for delivery in September 2009. The Farm Service Agency was unable to procure all the demand for peanut products because of industry capacity issues. States will be given the opportunity to move these orders into future deliveries or order other products. States are working to place new orders for the balance of their funds. Products available for States to order include: ham sliced 2-lb for October 2009 delivery; cheese (reduced fat) 2 lb loaves and 5 lb sliced for January and February 2009 delivery; and peanuts and peanut butter for October and November 2009 delivery. Invitations for bid will continue to be issued during July 2009. Below is a breakdown of the value of orders purchased and the value of purchases in progress. Total product values are estimated because actual prices will not be known until the purchases are made. Deliveries began the second half of May 2009, and will extend through February 2010. Commodity Amount Purchased Purchase in Progress Total Value Percentage of Total Dollars Type (In millions) (in millions) (in millions) Poultry 17.6 0 17.6 18 Livestock 25.4 7.0 32.4 33 Canned Fruit 15.2 0 15.2 16 Peanut Products 7.4 7.6 15.0 15 Cheese 8.0 9.5 17.5 18 All Products 73.6 24.1 97.7 100

- SNAP benefits are issued to participants in every State on an ongoing basis, and this issuance is reflected in the increased obligations and outlays. Obligations for the Food Distribution Program on Indian Reservations are being made to Indian Tribal Organizations (ITOs) and State agencies. These obligations are for budget amendments to their current agreements to reflect the use of ARRA funds for the purchase of equipment or for facilities upgrades.

- States continue to make awards to school food authorities to purchase food service equipment, and these awards are reflected in the increased outlays for the National School Lunch Program.

- Chief's Letter- FollowingSecretary Vilsack's announcement of additional funding under the American Recovery and Reinvestment Act (ARRA) for 105 Forest Service (FS) projects funded at more than $94.6 million, the Chief issued a letter directing prompt obligation of the funds and implementation of the projects. Approved Projects - In addition to the above, the Forest Service continued implementing the projects previously approved by Secretary Vilsack under ARRA. These projects total $936,641,700 or about 81 percent of the total amount of ARRA money received by the Forest Service for wildland fire management, construction and maintenance of facilities, roads and trails, and abandoned mine mitigation. The Agency has obligated $235,277,792through August 28. Outreach - The FS participated in National Minority Enterprise Development week August 26-28 in Washington, DC to promote employment and contracting opportunities through FS recovery projects. Milestones - The FS Recovery Plan includes a series of measurable goals such as the one cited above. The Forest Service has developed a series of milestones in order to better track progress towards the goals. Goals established for financial performance, capital improvement and maintenance activities and wildland fire management have been divided into quarterly increments, or milestones, so the Agency can assess its progress and make strategic adjustments as needed. Impact of ARRA on Tribes - the Agency has completed a draft analysis on the affect of ARRA projects on tribes. Benefits include job opportunities for local tribes and improving habitat and watersheds that support rural subsistence for traditional uses and food sources. In addition, the wildland fire management funds are providing increased wildfire protection for tribal lands through hazardous fuels reduction projects adjacent to communities. Some of the woody material being removed in such projects is being made available for the local tribal forest products industry. Finally, tribes are benefiting from invasive species control on and around tribal lands. Capital Improvement and Maintenance * The Forest Service continues to implement more than $274 million of funding announced for Capital Improvement and Maintenance - trails and facilities. * The Forest Service continues to implement 106 ARRA roads maintenance and associated watershed and ecosystem restoration projects on Forest Service lands in 31 states totaling $228,480,500. * The Forest Service continues implementation of 14 abandoned mine lands projects on Forest Service lands in seven states totaling $19,884,000. * The Forest Service continues implementation of the first set of projects approved under ARRA for Capital Improvement and Maintenance. * The FS monitors program accomplishments achieved through ARRA funding using measures such as "miles of trail maintained to standard." As a result of ARRA projects over 400 miles of trails have been maintained through August 24. Wildland Fire Management * The Forest Service continues to implement projects supported by $223.6 million of ARRA funds to reduce hazardous fuels, and over $38 million in projects funded by ARRA to manage invasive species. * ARRA wildland fire management allocations to date are $411,130,426of which$160,349,271 has been obligated. through August 28. * The FS monitors program accomplishments achieved through ARRA funding using measures such as "The number of acres treated to reduce the risk of catastrophic wildfire." As a result of ARRA projects, 33,000 acres have been treated to reduce wildfire risk. * The Forest Service continues to support wood-to-energy grants and woody biomass utilization projects totaling $57 million in ARRA funds. * The Forest Service continues implementation of the first set of projects approved under the ARRA for wildland fire management.

- Loan level obligations: Water and Environmental Loans/Grants:$ 1,211,978,271 / Business and Industries Loans/Grants: $7,420,592 / Community Facilities Direct Loans/Grants: $144,729,150/ SFH - Direct: $197,001,457 / SFH - Guaranteed: $7,102,788,769

- Loan level obligation: Water and Environmental Circuit Rider Contract Modifications: $4,100,334

- The Secretary announced the sixth tranche of Community Facilities projects totalling more than $54 million on August 26, 2009.

- The Secretary announced the seventh tranche of Water and Waste Disposal projects totalling $175.8 million on August 25, 2009.

- Posted to the USAJobs Web site, 2 recruitments for temporary positions to support the implementation of the Broadband Program under ARRA. Anticipate filling advertised positions by early September. To date, USDA Rural Development has filled 62 temporary positions nationwide to support the implementation of RD Programs under ARRA.

- Sent additional guidance to headquarters and State office staff on appropriate use of ARRA administrative funding in support of Rural Development program dollars.

- A pre-bid conference for interested bidders was held onAugust 11, 2009. USDA will prepare and issue an amendment to the solicitation to respond to questions from potential bidders to date. The solicitation notice or invitation for bid (IFB) will close on August 28, 2009. A construction contract is expected to be awarded by September 30, 2009. The construction and repair work is expected to be completed in November 2010.

- It is anticipated that approximately $100,000 will be obligated for the next reporting period. For the 4h quarter FY 2009, we anticipate obligating approximately $8,017,000.

- Capital Improvement and Maintenance Continued posting of major ARRA communications; Continued implementation of approved projects. Wildland Fire Management * An announcement about the distribution of $67,108,700 inForest Service ARRA funds for 58 forest health projects is expected next week; * The Forest Service has received a number of inquiries at various units from recipients about reporting. Recipients want more information about their reporting responsibilities. The Agency is keeping its ARRA points of contact in the field informed about reporting information sources so they can assist recipients. It is also directing recipients to Recovery.gov, and the website of the Office of Management and Budget for online training and other information, and has added links from the FS ARRA website to these resources. Continued posting of major ARRA communications; Continued evaluation of ARRA project proposals; Continued implementation of approved projects.

- Expect to announce the seventh tranche of Community Facilities projects; estimated total $17.5 million.

- Expect to announce the eighth tranche of Water and Waste Disposal projects totalling in excess of $172.5 million.

- Submit the first tranche of Business and Industry projects totalling more than $13 million to OMB for clearance.

View Source file Report History Report Date Source 2009-08-28 View Source file 2009-08-21 View Source file 2009-08-14 View Source file 2009-08-07 View Source file 2009-07-31 View Source file 2009-07-24 View Source file 2009-07-17 View Source file 2009-07-10 View Source file 2009-07-03 View Source file 2009-06-26 View Source file 2009-06-19 View Source file 2009-06-12 View Source file 2009-06-05 View Source file 2009-05-29 View Source file 2009-05-22 View Source file 2009-05-15 View Source file 2009-05-08 View Source file 2009-05-01 View Source file 2009-04-24 View Source file 2009-04-17 View Source file 2009-04-10 View Source file 2009-04-03 View Source file 2009-03-27 View Source file 2009-03-20 View Source file 2009-03-13 View Source file 2009-03-06 View Source file 2009-03-02 View Source file

YOU ARE EXITING THE RECOVERY.GOV WEBSITE

====================================================================== USDA - Financial and Activity Report | Recovery.gov www.recovery.gov/?q=content/weekly-report&agency_code=12&agency=&startdate=2009-08-21&noofreports=2&summarytype=&report_id=1038&nex= — captured 2009-08-29 ======================================================================

- Total Available: $5,203,474,167

- Total Paid Out: $3,893,973,383

- Continuing with the execution of the ARRA Program. To date, 22 contract actions have been processed for a cumulative total of $4,850,032.

- USDA continues to purchase food for the purpose of supporting The Emergency Food Assistance Program (TEFAP) in each State, and the increased TEFAP outlays reflect these purchases. American Recovery and Reinvestment Act of 2009 (ARRA) Purchases For The Emergency Food Assistance Program Purchases of USDA food with ARRA funds continue. During the week of August 3, 2009, the Agricultural Marketing Service released a purchase invitation for ham for delivery in October 2009. Below is a breakdown of the value of orders purchased and the value of purchases in progress. Total product values are estimated because actual prices will not be known until the purchases are made. Deliveries began the second half of May 2009, and will extend through February 2010. Commodity Type Amount Purchased (in millions) Purchase in Progress (in millions) Total Value (in millions) Percentage of Total Dollars Poultry 17.6 0 17.6 18 Livestock 25.4 7.0 32.4 33 Canned Fruit 15.2 0 15.2 16 Peanut Products 7.4 7.7 15.1 15 Cheese 7.3 10.5 17.8 18 All Products 72.9 25.2 98.1 100

- States continue to make awards to school food authorities to purchase food service equipment, and these awards are reflected in the increased outlays for the National School Lunch Program.

- SNAP benefits are issued to participants in every State on an ongoing basis, and this issuance is reflected in the increased obligations and outlays. ARRA-funded Food distribution Program on Indian Reservations (FDPIR) awards for equipment and facilities upgrades will continue be made to Indian Tribal Organizations in the coming weeks as requests are received and approved by FNS Regional Offices. Obligations for the Food Distribution Program on Indian Reservations are being made to Indian Tribal Organizations (ITOs) and State agencies. These obligations are for budget amendments to their current agreements to reflect the use of ARRA funds for the purchase of equipment or for facilities upgrades.

- Projects Announced August 18 -Secretary Vilsack announced additional funding under the American Recovery and Reinvestment Act (ARRA) for Forest Service (FS) projects in 36 states. The 105 projects, funded at more than $94.6 million, are located on Federal, state, and private lands. To date, USDA has announced $1.03 billion of the $ 1.15 billion - or 89% - of funds authorized by ARRA for Forest Service projects. Approved Projects - The Forest Service continued implementing the projects approved by Secretary Vilsack under ARRA throughout the nation. These projects total $936,641,700 or about 81 percent of the total amount of ARRA money received by the Forest Service for wildland fire management, construction and maintenance of facilities, roads and trails, and abandoned mine mitigation. The Agency has obligated $167,022,152.00through August 21. Outreach - The FS participated in "Keep Idaho Working," Congressman Walt Minnick's conference to connect Idaho businesses to federal and state contracts, in Boise Idaho. The Agency also took part in the Small Business Conference in Mahnomen, Minnesota to provide training on ARRA-related contracting, and in the 30th Annual California Hispanic Chamber of Commerce State Convention to offer information about ARRA employment opportunities. Benchmark Events - The FShas identified six benchmark ARRA events for USDA to consider highlighting in Ohio, California, Colorado, New Mexico, and Oregon. These projects demonstrate the impact of ARRA on expanding the use of green energy, providing jobs to youth and veterans, increasing economic opportunities to tribes, or improving resources. Impact of ARRA on Green Energy - the Agency began preparations for a report on the impact of ARRA projects on green energy, focusing on alternative energy sources such as wood-to-energy and woody biomass projects, and capital improvement facilities projects that entail reducing energy consumption. FS NIMO Teams and Recipient Reporting - The Forest Service is coordinating required end of year reporting by state, county and local recipients of grants, loans or cooperative agreements with the federal government under ARRA. Over 150,000 recipients nationwide are expected to report and the Agency will use its National Incident Management Organization (NIMO) to coordinate this task. Although NIMO's primary focus is large wildfire management, it will apply the same strategies and skills to efficiently manage the reporting process. Four teams, each with seven Forest Service employees serve in NIMO. Individuals from various teams will participate in the recipient reporting assignment, leaving others available to respond to incidents. Guided by an interagency steering committee and representatives from the Office of Management and Budget and the Recovery Act Transparency Board, during the reporting period of October 1-10 teams will refer recipient questions, coordinate a call center for information technology issues, provide answers to frequently asked questions and more. Capital Improvement and Maintenance * The Forest Service continues to implement more than $274 million of funding announced for Capital Improvement and Maintenance - trails and facilities. * The Forest Service continues to implement 106 ARRA roads maintenance and associated watershed and ecosystem restoration projects on Forest Service lands in 31 states totaling $228,480,500. * The Forest Service continues implementation of 14 abandoned mine lands projects on Forest Service lands in seven states totaling $19,884,000. * The Forest Service continues implementation of the first set of projects approved under ARRA for Capital Improvement and Maintenance. Wildland Fire Management * The Forest Service continues to implement projects supported by $223.6 million of ARRA funds to reduce hazardous fuels, and over $38 million in projects funded by ARRA to manage invasive species. * The FS monitors program accomplishments achieved through ARRA funding using measures such as "The number of acres treated to reduce the risk of catastrophic wildfire". As a result of ARRA projects, 26,744 acres have been treated through August 17. * ARRA wildland fire management allocations to date are $362,691,100 of which$73,932,843 has been obligated. through August14.. * The Forest Service continues to support wood-to-energy grants and woody biomass utilization projects totaling $57 million in ARRA funds. * The Forest Service continues implementation of the first set of projects approved under the ARRA for wildland fire management.

- Loan level obligations: Water and Environmental Loans/Grants:$ 1,175,840,715 / Business and Industries Loans/Grants: $4,227,307 / Community Facilities Direct Loans/Grants: $125,687,177 SFH - Direct: $197,108,701 / SFH - Guaranteed: $6,699,777,003

- Loan level obligation: Water and Environmental Circuit Rider Contract Modifications: $4,100,334

- A pre-bid conference for interested bidders was held on August 11, 2009. The solicitation notice or invitation for bid (IFB) will close on August 26, 2009. A construction contract is expected to be awarded bySeptember 30, 2009. The construction and repair work is expected to be completed in November 2010.

- It is anticipated that approximately $100,000 will be obligated for the next reporting period. For the 4th quarter FY 2009, we anticipate obligating approximately $8,017,000.

- MAJOR PLANNED ITEMS: Capital Improvement and Maintenance The FS is identifying opportunities to expand capacity. These include addressing a shortage of contracting officers' representatives and engineers to prepare contracting bid packages and oversee work, and the need for architectural design firms that can provide timely work because of the large number of projects. The Agency is exploring such options as reemploying annuitants, training, sharing of resources, standardized design plans and other solutions. Continued posting of major ARRA communications; Continued implementation of approved projects. Wildland Fire Management * An announcement about the distribution of $67,108,700 inForest Service ARRA funds for 58 forest health projects is expected next week; Continued posting of major ARRA communications; Continued evaluation of ARRA project proposals; Continued implementation of approved projects.

- Expect to announce the sixth tranche of Community Facilities projects; estimated total $54.4 million

- Expect to announce the seventh tranche of Water and Waste Disposal projects; estimated total $177.54 million

- Expect to announce the seventh tranche of Community Facilities projects; estimated total $17.5 million

View Source file Report History Report Date Source 2009-08-21 View Source file 2009-08-14 View Source file 2009-08-07 View Source file 2009-07-31 View Source file 2009-07-24 View Source file 2009-07-17 View Source file 2009-07-10 View Source file 2009-07-03 View Source file 2009-06-26 View Source file 2009-06-19 View Source file 2009-06-12 View Source file 2009-06-05 View Source file 2009-05-29 View Source file 2009-05-22 View Source file 2009-05-15 View Source file 2009-05-08 View Source file 2009-05-01 View Source file 2009-04-24 View Source file 2009-04-17 View Source file 2009-04-10 View Source file 2009-04-03 View Source file 2009-03-27 View Source file 2009-03-20 View Source file 2009-03-13 View Source file 2009-03-06 View Source file 2009-03-02 View Source file

YOU ARE EXITING THE RECOVERY.GOV WEBSITE

====================================================================== USDA - Financial and Activity Report | Recovery.gov www.recovery.gov/?q=content/weekly-report&agency_code=12&agency=&startdate=2009-08-21&noofreports=2&summarytype=&report_id=1038&nex=1 — captured 2009-08-31 ======================================================================

- Total Available: $5,203,474,167

- Total Paid Out: $3,893,973,383

- Continuing with the execution of the ARRA Program. To date, 22 contract actions have been processed for a cumulative total of $4,850,032.

- USDA continues to purchase food for the purpose of supporting The Emergency Food Assistance Program (TEFAP) in each State, and the increased TEFAP outlays reflect these purchases. American Recovery and Reinvestment Act of 2009 (ARRA) Purchases For The Emergency Food Assistance Program Purchases of USDA food with ARRA funds continue. During the week of August 3, 2009, the Agricultural Marketing Service released a purchase invitation for ham for delivery in October 2009. Below is a breakdown of the value of orders purchased and the value of purchases in progress. Total product values are estimated because actual prices will not be known until the purchases are made. Deliveries began the second half of May 2009, and will extend through February 2010. Commodity Type Amount Purchased (in millions) Purchase in Progress (in millions) Total Value (in millions) Percentage of Total Dollars Poultry 17.6 0 17.6 18 Livestock 25.4 7.0 32.4 33 Canned Fruit 15.2 0 15.2 16 Peanut Products 7.4 7.7 15.1 15 Cheese 7.3 10.5 17.8 18 All Products 72.9 25.2 98.1 100

- States continue to make awards to school food authorities to purchase food service equipment, and these awards are reflected in the increased outlays for the National School Lunch Program.

- SNAP benefits are issued to participants in every State on an ongoing basis, and this issuance is reflected in the increased obligations and outlays. ARRA-funded Food distribution Program on Indian Reservations (FDPIR) awards for equipment and facilities upgrades will continue be made to Indian Tribal Organizations in the coming weeks as requests are received and approved by FNS Regional Offices. Obligations for the Food Distribution Program on Indian Reservations are being made to Indian Tribal Organizations (ITOs) and State agencies. These obligations are for budget amendments to their current agreements to reflect the use of ARRA funds for the purchase of equipment or for facilities upgrades.

- Projects Announced August 18 -Secretary Vilsack announced additional funding under the American Recovery and Reinvestment Act (ARRA) for Forest Service (FS) projects in 36 states. The 105 projects, funded at more than $94.6 million, are located on Federal, state, and private lands. To date, USDA has announced $1.03 billion of the $ 1.15 billion - or 89% - of funds authorized by ARRA for Forest Service projects. Approved Projects - The Forest Service continued implementing the projects approved by Secretary Vilsack under ARRA throughout the nation. These projects total $936,641,700 or about 81 percent of the total amount of ARRA money received by the Forest Service for wildland fire management, construction and maintenance of facilities, roads and trails, and abandoned mine mitigation. The Agency has obligated $167,022,152.00through August 21. Outreach - The FS participated in "Keep Idaho Working," Congressman Walt Minnick's conference to connect Idaho businesses to federal and state contracts, in Boise Idaho. The Agency also took part in the Small Business Conference in Mahnomen, Minnesota to provide training on ARRA-related contracting, and in the 30th Annual California Hispanic Chamber of Commerce State Convention to offer information about ARRA employment opportunities. Benchmark Events - The FShas identified six benchmark ARRA events for USDA to consider highlighting in Ohio, California, Colorado, New Mexico, and Oregon. These projects demonstrate the impact of ARRA on expanding the use of green energy, providing jobs to youth and veterans, increasing economic opportunities to tribes, or improving resources. Impact of ARRA on Green Energy - the Agency began preparations for a report on the impact of ARRA projects on green energy, focusing on alternative energy sources such as wood-to-energy and woody biomass projects, and capital improvement facilities projects that entail reducing energy consumption. FS NIMO Teams and Recipient Reporting - The Forest Service is coordinating required end of year reporting by state, county and local recipients of grants, loans or cooperative agreements with the federal government under ARRA. Over 150,000 recipients nationwide are expected to report and the Agency will use its National Incident Management Organization (NIMO) to coordinate this task. Although NIMO's primary focus is large wildfire management, it will apply the same strategies and skills to efficiently manage the reporting process. Four teams, each with seven Forest Service employees serve in NIMO. Individuals from various teams will participate in the recipient reporting assignment, leaving others available to respond to incidents. Guided by an interagency steering committee and representatives from the Office of Management and Budget and the Recovery Act Transparency Board, during the reporting period of October 1-10 teams will refer recipient questions, coordinate a call center for information technology issues, provide answers to frequently asked questions and more. Capital Improvement and Maintenance * The Forest Service continues to implement more than $274 million of funding announced for Capital Improvement and Maintenance - trails and facilities. * The Forest Service continues to implement 106 ARRA roads maintenance and associated watershed and ecosystem restoration projects on Forest Service lands in 31 states totaling $228,480,500. * The Forest Service continues implementation of 14 abandoned mine lands projects on Forest Service lands in seven states totaling $19,884,000. * The Forest Service continues implementation of the first set of projects approved under ARRA for Capital Improvement and Maintenance. Wildland Fire Management * The Forest Service continues to implement projects supported by $223.6 million of ARRA funds to reduce hazardous fuels, and over $38 million in projects funded by ARRA to manage invasive species. * The FS monitors program accomplishments achieved through ARRA funding using measures such as "The number of acres treated to reduce the risk of catastrophic wildfire". As a result of ARRA projects, 26,744 acres have been treated through August 17. * ARRA wildland fire management allocations to date are $362,691,100 of which$73,932,843 has been obligated. through August14.. * The Forest Service continues to support wood-to-energy grants and woody biomass utilization projects totaling $57 million in ARRA funds. * The Forest Service continues implementation of the first set of projects approved under the ARRA for wildland fire management.

- Loan level obligations: Water and Environmental Loans/Grants:$ 1,175,840,715 / Business and Industries Loans/Grants: $4,227,307 / Community Facilities Direct Loans/Grants: $125,687,177 SFH - Direct: $197,108,701 / SFH - Guaranteed: $6,699,777,003

- Loan level obligation: Water and Environmental Circuit Rider Contract Modifications: $4,100,334

- A pre-bid conference for interested bidders was held on August 11, 2009. The solicitation notice or invitation for bid (IFB) will close on August 26, 2009. A construction contract is expected to be awarded bySeptember 30, 2009. The construction and repair work is expected to be completed in November 2010.

- It is anticipated that approximately $100,000 will be obligated for the next reporting period. For the 4th quarter FY 2009, we anticipate obligating approximately $8,017,000.

- MAJOR PLANNED ITEMS: Capital Improvement and Maintenance The FS is identifying opportunities to expand capacity. These include addressing a shortage of contracting officers' representatives and engineers to prepare contracting bid packages and oversee work, and the need for architectural design firms that can provide timely work because of the large number of projects. The Agency is exploring such options as reemploying annuitants, training, sharing of resources, standardized design plans and other solutions. Continued posting of major ARRA communications; Continued implementation of approved projects. Wildland Fire Management * An announcement about the distribution of $67,108,700 inForest Service ARRA funds for 58 forest health projects is expected next week; Continued posting of major ARRA communications; Continued evaluation of ARRA project proposals; Continued implementation of approved projects.

- Expect to announce the sixth tranche of Community Facilities projects; estimated total $54.4 million

- Expect to announce the seventh tranche of Water and Waste Disposal projects; estimated total $177.54 million

- Expect to announce the seventh tranche of Community Facilities projects; estimated total $17.5 million

View Source file Report History Report Date Source 2009-08-21 View Source file 2009-08-14 View Source file 2009-08-07 View Source file 2009-07-31 View Source file 2009-07-24 View Source file 2009-07-17 View Source file 2009-07-10 View Source file 2009-07-03 View Source file 2009-06-26 View Source file 2009-06-19 View Source file 2009-06-12 View Source file 2009-06-05 View Source file 2009-05-29 View Source file 2009-05-22 View Source file 2009-05-15 View Source file 2009-05-08 View Source file 2009-05-01 View Source file 2009-04-24 View Source file 2009-04-17 View Source file 2009-04-10 View Source file 2009-04-03 View Source file 2009-03-27 View Source file 2009-03-20 View Source file 2009-03-13 View Source file 2009-03-06 View Source file 2009-03-02 View Source file

YOU ARE EXITING THE RECOVERY.GOV WEBSITE

====================================================================== USDA - Financial and Activity Report | Recovery.gov www.recovery.gov/?q=content/weekly-report&agency_code=12&agency=&startdate=2009-09-04&noofreports=2&summarytype=&report_id=1132&nex= — captured 2009-09-19 ======================================================================

- Total Available: $5,558,674,390

- Total Paid Out: $4,220,292,744

- Continuing with the execution of the ARRA Program. To date, 25 contract actions have been processed for a cumulative total of $4,905,374.

- States continue to make awards to school food authorities to purchase food service equipment, and these awards are reflected in the increased outlays for the National School Lunch Program. As of August 7, 2009, all States have awarded the American Recovery and Reinvestment Act of 2009's (ARRA) National School Lunch Program (NSLP) Equipment Assistance Grants to school food authorities through a competitive grant process. States reported receiving nearly 24,000 grant applications, totaling a requested amount of nearly $640 million. Out of these requests, 5,031 grants were awarded to local schools.

- SNAP benefits are issued to participants in every State on an ongoing basis, and this issuance is reflected in the increased obligations and outlays. Obligations for the Food Distribution Program on Indian Reservations are being made to Indian Tribal Organizations (ITOs) and State agencies. These obligations are for budget amendments to their current agreements to reflect the use of ARRA funds for the purchase of equipment or for facilities upgrades.

- USDA continues to purchase food for the purpose of supporting The Emergency Food Assistance Program (TEFAP) in each State, and the increased TEFAP outlays reflect these purchases. American Recovery and Reinvestment Act of 2009 (ARRA) Purchases For The Emergency Food Assistance Program Purchases of food with ARRA funds are in progress. During the week of August 17, 2009, no new contracts were awarded. The Farm Service Agency released a purchase invitation for January and February 2009 deliveries of processed cheese. Purchase awards will continue to be made for ham, cheese, peanuts, and peanut butter. Below is a breakdown of the value of orders purchased and the value of purchases in progress. Total product values are estimated because actual prices will not be known until the purchases are made. Deliveries began in the second half of May 2009, and will extend through February 2010. Commodity Amount Purchased Purchase in Progress Total Value Percentage of Total Dollars Type (In millions) (in millions) (in millions) Poultry 17.6 0 17.6 18 Livestock 25.4 7.5 32.9 33 Canned Fruit 15.2 0 15.2 16 Peanut Products 7.4 7.6 15.0 15 Cheese 8.0 9.5 17.5 18 All Products 73.6 24.6 98.2 100

- Approved Projects - The Forest Service continued implementing the projects previously approved by Secretary Vilsack under ARRA. These projects total $1.031 billionor about 90 percent of the total amount of ARRA money received by the Forest Service for wildland fire management, construction and maintenance of facilities, roads and trails, and abandoned mine mitigation. The Agency has obligated$242,325,506.00through September 4. Northeastern Area Obligates 100% - The Northeastern Area of the Forest Service has obligated 100% of its Recovery Act grants - about $30 million. Survey of Contracting and Grants Staff - The Forest Service completed its response to a Recovery Act Transparency Board survey of all executive agencies regarding the numbers and qualifications of the contracts, grants and agreements staffs engaged in working on Recovery Act projects. The complete survey includes seven functional position categories; Contracting Officers, Contracting Officer Representatives, Contract Program Managers, Contract Support Personnel, Grants Officers, Grants Program Managers, and Grants Specialists. Salary Offset Waiver - The Forest Service and the Office of Personnel Management (OPM) held a productive meeting following OPM's denial of a FS request for salary offset waiver authority. The authority, if granted, would permit the hiring of annuitants in the forester, forestry technician, civil engineer and civil engineering technician fields. The FS prepared a more detailed account of its critical need for the waiver, which OPM will consider again. Capital Improvement and Maintenance * The Forest Service continues to implement more than $274 million of funding announced for Capital Improvement and Maintenance - trails and facilities. * The Forest Service continues to implement 106 ARRA roads maintenance and associated watershed and ecosystem restoration projects on Forest Service lands in 31 states totaling $228,480,500. * The Forest Service continues implementation of 14 abandoned mine lands projects on Forest Service lands in seven states totaling $19,884,000. * The Forest Service continues implementation of the first set of projects approved under ARRA for Capital Improvement and Maintenance. * The FS monitors program accomplishments achieved through ARRA funding using measures such as "miles of trail maintained to standard." As a result of ARRA projects over 400 miles of trails and 128 miles of roads have been maintained through August 24. Wildland Fire Management * The Forest Service continues to implement projects supported by $223.6 million of ARRA funds to reduce hazardous fuels, and over $38 million in projects funded by ARRA to manage invasive species. * ARRA wildland fire management allocations to date are$411,130,426of which$166,134,179 has been obligated. through September 4. * The FS monitors program accomplishments achieved through ARRA funding using measures such as "The number of acres treated to reduce the risk of catastrophic wildfire." As a result of ARRA projects, 33,000 acres have been treated to reduce wildfire risk. * The Forest Service continues to support wood-to-energy grants and woody biomass utilization projects totaling $57 million in ARRA funds. * The Forest Service continues implementation of the first set of projects approved under the ARRA for wildland fire management.

- Loan level obligations: Water and Environmental Loans/Grants:$ 1,237,135,471 / Business and Industries Loans/Grants: $10,171,187 / Community Facilities Direct Loans/Grants: $148,906,998/ SFH - Direct: $197,043,257 / SFH - Guaranteed: $7,462,795,389

- Loan level obligation: Water and Environmental Circuit Rider Contract Modifications: $4,100,334

- The Secretary announced the eighth tranche of Water and Waste Disposal projects totaling $172.5 million on September 3, 2009.

- Procurement will begin the process of awarding the project. This includes determining the bids responsive and the apparent low bidder's acceptability for award. A construction contract is expected to be awarded by September 30, 2009. The construction and repair work is expected to be completed in November 2010.

- It is anticipated that approximately $700,000 will be obligated for the next reporting period. For the 4th quarter FY 2009, we antcipate obligating approximately $8,017,000.

- Capital Improvement and Maintenance The FS began working with the Office of Inspector General (OIG) on several audits initiated this week. OIG will audit facility improvement, maintenance and renovation projects and abandoned mine remediation projects. Continued posting of major ARRA communications; Continued implementation of approved projects. Wildland Fire Management * The FS began working with the Office of Inspector General (OIG) on several audits initiated this week. OIG will audit wood-to-energy/biomass projects; hazardous fuels reduction and ecosystem restoration projects on non-federal lands. * An announcement about the distribution of $67,108,700 inForest Service ARRA funds for 58 forest health projects is expected next week; * The Forest Service has received a number of inquiries at various units from recipients about reporting. Recipients want more information about their reporting responsibilities. The Agency is keeping its ARRA points of contact in the field informed about reporting information sources so they can assist recipients. It is also directing recipients to Recovery.gov, and the website of the Office of Management and Budget for online training and other information, and has added links from the FS ARRA website to these resources. Continued posting of major ARRA communications; Continued evaluation of ARRA project proposals; Continued implementation of approved projects.

- Expect to announce the seventh tranche of Community Facilities projects; estimated total $17.5 million.

- Submit the first and second tranche of Business and Industry projects to OMB for clearance; approximate total $56 million.

View Source file Report History Report Date Source 2009-09-11 View Source file 2009-09-04 View Source file 2009-08-28 View Source file 2009-08-21 View Source file 2009-08-14 View Source file 2009-08-07 View Source file 2009-07-31 View Source file 2009-07-24 View Source file 2009-07-17 View Source file 2009-07-10 View Source file 2009-07-03 View Source file 2009-06-26 View Source file 2009-06-19 View Source file 2009-06-12 View Source file 2009-06-05 View Source file 2009-05-29 View Source file 2009-05-22 View Source file 2009-05-15 View Source file 2009-05-08 View Source file 2009-05-01 View Source file 2009-04-24 View Source file 2009-04-17 View Source file 2009-04-10 View Source file 2009-04-03 View Source file 2009-03-27 View Source file 2009-03-20 View Source file 2009-03-13 View Source file 2009-03-06 View Source file 2009-03-02 View Source file

YOU ARE EXITING THE RECOVERY.GOV WEBSITE

====================================================================== USDA - Financial and Activity Report | Recovery.gov www.recovery.gov/?q=content/weekly-report&agency_code=12&agency=&startdate=2009-09-11&noofreports=2&summarytype=&report_id=1175&nex= — captured 2009-09-19 ======================================================================

- Total Available: $6,081,188,496

- Total Paid Out: $4,490,702,117

- USDA sent the Invitation for Bid (IFB) solicitation notice to Federal Business Opportunities on July 28, 2009 for the award of the construction contract for the next phase of the USDA South Building Modernization project. Bid Opening was conducted on August 28, 2009. Procurement is reviewing submissions and preparing award which is anticipated this fiscal year.Identified available space in the NCR to house employees that will be displaced due to construction of Phase 4a.

- Final Funding Announcement - On Wednesday Secretary Vilsack announced the distribution of $89 million in ARRA funds for 78 forest health projects, completing the distribution of $1.15 billion authorized for the Forest Service under the Recovery Act. Approved Projects - The Forest Service continued implementing the projects previously approved by Secretary Vilsack under ARRA. These projects total $1.031 billion or about 90 percent of the total amount of ARRA money received by the Forest Service for wildland fire management, construction and maintenance of facilities, roads and trails, and abandoned mine mitigation. The Agency has obligated $259,538,245 through September 11. Safety Messages - The Agency continued to emphasize safety in its internal ARRA communications. Many employees are implementing Recovery projects and the normal program of work, and are striving to complete assignments on time. They are coordinating with outside partners in ways they never have before to accomplish the job. These factors make safety more important than ever. The internal FS Economic Recovery website has a new section featuring the Chief's letter on safety policy and a link to the National Office of Safety and Health. A recent update to employees from the Economic Recovery team defines ARRA success as creating jobs, improving the environment, and going home safely at the end of the day. Capital Improvement and Maintenance The Forest Service continues to implement more than $274 million of funding announced for Capital Improvement and Maintenance - trails and facilities. The Agency continues to implement 106 ARRA roads maintenance and associated watershed and ecosystem restoration projects on Forest Service lands in 31 states totaling $228,480,500. The Forest Service continues implementation of 14 abandoned mine lands projects on Forest Service lands in seven states totaling $19,884,000. The Forest Service continues implementation of the first set of projects approved under ARRA for Capital Improvement and Maintenance. Wildland Fire Management The Forest Service worked with the Office of Inspector General as it initiated an audit of all Forest Service ARRA wildland fire management projects on federal lands. The Forest Service continues to implement projects supported by $223.6 million of ARRA funds to reduce hazardous fuels, and over $38 million in projects funded by ARRA to manage invasive species. The Agency monitors program accomplishments achieved through ARRA funding using measures such as "The number of acres treated to reduce the risk of catastrophic wildfire." As a result of ARRA more than 46,000 acres have been treated to reduce wildfire risk and more than 50 fuels reduction projects have been funded on nonfederal lands through September 8. The Forest Service continues to support wood-to-energy grants and woody biomass utilization projects totaling $57 million in ARRA funds. The Forest Service continues implementation of the first set of projects approved under the ARRA for wildland fire management.

- Continuing with the execution of the ARRA Program. To date, 33 contract actions have been processed for a cululative total of $5,270,679.

- First Wave of WIC ARRA Funds Released The Food and Nutrition Service released approximately $34 million in ARRA funding this week to selected WIC State agencies with ongoing technology projects. Of this amount, approximately $9 million was provided to eight State agencies with existing electronic benefit transfer projects and approximately $25 million was provided to seven State agencies with existing State Agency Model projects. These funds will be used to improve and modernize WIC systems and enhance benefit delivery in the Program.

- American Recovery and Reinvestment Act of 2009 (ARRA) Purchases For The Emergency Food Assistance Program Purchases of food with ARRA funds are in progress. During the week of August 24, 2009, no new contracts were awarded. We are consulting with Agricultural Marketing Service-Poultry Division on the possibility of purchasing a poultry product with remaining ARRA funds. Purchase awards will continue to be made for ham, cheese, peanuts and peanut butter. Below is a breakdown of the value of orders purchased and the value of purchases in progress. Total product values are estimated because actual prices will not be known until the purchases are made. Deliveries began the second half of May 2009, and will extend through February 2010. Commodity Type Amount Purchased (in millions) Purchase in Progress (in millions) Total Value (in millions) Percentage of Total Dollars Poultry 17.6 Commodity Amount Purchased Purchase in Progress Total Value Percentage of Total Dollars Type (In millions) (in millions) (in millions) Poultry 17.6 0 17.6 18 Livestock 25.4 7.5 32.9 33 Canned Fruit 15.2 0 15.2 16 Peanut Products 7.4 7.6 15.0 15 Cheese 8.0 9.5 17.5 18 All Products 73.6 24.6 98.2 100

- SNAP benefits are issued to participants in every State on an ongoing basis, and this issuance is reflected in the increased obligations and outlays. Obligations for the Food Distribution Program on Indian Reservations are being made to Indian Tribal Organizations (ITOs) and State agencies. These obligations are for budget amendments to their current agreements to reflect the use of ARRA funds for the purchase of equipment or for facilities upgrades.

- Loan level obligations: Water and Environmental Loans/Grants:$ 1,326,161,361 / Business and Industries Loans/Grants: $10,970,260 / Community Facilities Direct Loans/Grants: $153,550,224 / SFH - Direct: $196,812,613 / SFH - Guaranteed: $7,715,487,385

- Loan level obligation: Water and Environmental Circuit Rider Contract Modifications: $4,100,334

- The Secretary announced the seventh tranche of Community Facilities projects totaling $17.5 million on September 2, 2009.

- Of the 100 plus Rural Business Enterprise Grants ARRA projects obligated to date, over 55 projects in more than 20 states were projects obligated in counties with persistent poverty, outmigration, high unemployment and underrepresented/underserved.

- Procurement will begin the process of awarding the project. This includes determining the bids responsive and the apparent low bidder's acceptability for award. A construction contract is expected to be awarded by September 30, 2009. The construction and repair work is expected to be completed in November 2010.

- The Agency's Economic Recovery Operations Centers plan to increase their staffing to more efficiently handle the large number of ARRA project contracts, grants and agreements expected in the next 90-120 days. Capital Improvement and Maintenance The Forest Service will continue working with the Office of Inspector General (OIG) on several audits. OIG is auditing facility improvement, maintenance and renovation projects and abandoned mine remediation projects; Continued posting of major ARRA communications; Continued implementation of approved projects. Wildland Fire Management The Forest Service will continue working with the Office of Inspector General (OIG) on several audits. OIG is auditing wood-to-energy/biomass projects; hazardous fuels reduction and ecosystem restoration projects on non-federal lands; Continued posting of major ARRA communications; Continued implementation of approved projects.

- It is anticipated that approximately $600,000 will be obligated for the next reporting period. For the 4th quarter FY 2009, we anticipate obligating approximately $8,017,000.

- Expect to announce the first and second tranches of Business and Industry projects totaling $56.3 million.